Project Info

Client – AITEO Eastern E&P Limited

Status – Pre-FEED Completed. Detailed Design Ongoing

Date –  July, 2020

AITEO Eastern E&P Limited operates OML 29, a large oil block in the swamps of Nigeria’s Eastern Niger Delta.

Owing to frequent vandalization of its NCTL crude oil pipeline AITEO is currently building a 200,000 barrels per day crude oil dehydration and export facility near its Nembe 1 Flowstation to serve as Alternative Evacuation Route (AER) for crude oil produced at OML 29.

INFIL Petroleum has been contracted by Client to Engineer, Procure and Construct a circa 1KM, 6” pipeline to deliver 5MMSCFD of fuel gas from Nembe 1 Flow station to the new AER facility.